HDD Trenchless Installation with Underground Confidence

ECI’s in-house HDD experts, specialized equipment, and proven processes deliver safe, efficient trenchless installations across complex terrains, conditions, and projects.

Why Choose ECI for Horizontal Directional Drilling

At ECI, we know horizontal directional drilling (HDD) projects demand precision and experience.

We combine in-house HDD expertise with the right equipment fleet and safety-first processes to deliver trenchless solutions that protect timelines, budgets, and communities.

  • Over 100+ years of combined construction experience from leadership team
  • Partner with clients to deliver outside the box solutions to complex projects
  • Experienced HDD crews for small- and large-diameter installations
  • Equipment fleet capable of short bores and long-distance crossings
  • Proven hydrofracture risk evaluation and mitigation practices
Team of ECI Contracting HDD experts in safety gear, posing in front of trench and drilling equipment, showcasing expertise in horizontal directional drilling installations.

Markets We Serve

Our Horizontal Directional Drilling Services

Construction crew overseeing horizontal directional drilling (HDD) operation, handling large pipeline section with cranes and equipment in urban setting, emphasizing safety and teamwork.

In-House HDD Expertise

Our teams specialize in HDD, from design and planning to execution.

  • Decades of combined HDD experience
  • Safety-focused project delivery
  • Operator-qualified crews

HDD Equipment Fleet

We have rigs sized for every project, from small urban installs to large-diameter, long-distance bores.

  • Small rigs for tight access installations
  • Large rigs for high-capacity pipeline crossings
  • Fluid handling equipment for all lengths and diameters of installation
HDD equipment fleet featuring fluid handling systems and storage containers for trenchless installations, supporting small- and large-diameter projects in various markets including oil, gas, and utilities.
Horizontal directional drilling (HDD) equipment setup with drilling rig, pipes, and fluid handling systems in a construction site for utility installations.

HDD Material Installation Capabilities

We install a wide range of materials to meet client needs.

  • Steel pipelines for oil & gas
  • Ductile iron and PVC for water systems
  • HDPE/poly and conduit for utilities and energy
  • Fiber and cable installation for joint trench systems

HDD Drilling Approaches

Our crews adapt to market-specific needs.

  • Land-to-Land crossings under obstacles
  • Land-to-Water tie-ins at shorelines and waterways
  • Water-to-Water crossings beneath rivers and lakes
HDD drilling equipment with a waterway backdrop, showcasing a directional drill head used for land-to-water tie-ins and utility installations.
Laptop displaying HDD survey data and directional metrics for hydrofracture risk evaluation in trenchless installations.

Hydrofracture Risk Evaluation for HDD

Before every bore, we evaluate design parameters and geology to mitigate risks.

  • Detailed geotechnical review
  • Drilling fluid design and monitoring
  • Contingency planning for sensitive crossings

HDD Utility Location & Potholing

We protect existing infrastructure through advanced locating methods.

  • Vacuum excavation and potholing
  • GIS-based mapping
  • Coordination with utility owners
Excavated trench revealing yellow utility pipe, showcasing potholing technique for utility location and infrastructure protection.

Our Simple, Streamlined Process

Gaining Confidence Underground Starts Here

With ECI, you gain a clear path forward and peace of mind with a trusted partner on your side known for quality and safety.

Let’s discuss your HDD needs and site conditions.

We align constructability, material, and drilling approach.

Your trenchless installation is delivered with safety, precision, and efficiency.

Our fleet supports small-diameter urban crossings up to large-diameter, long-distance bores for oil, gas, and utility projects.

We install steel, ductile iron, PVC, HDPE/poly, conduit, and cable depending on project needs.

We conduct hydrofracture risk analysis, design drilling fluids appropriately, and monitor pressures throughout the bore.

Yes. We provide vacuum excavation, potholing, and GIS documentation to confirm clear paths before starting HDD.